Kitchen Renovation: Part 2

March 3, 2014

Now that the walls and ceiling of our kitchen have been exposed, new electrical wiring and boxes are being installed.   The valances, so typical of Mid-Century design, have been preserved and in some areas extended.  In case of any late night entertaining, we added a pocket door to separate the dining area from the hallway leading to the bedrooms.  This so that those who tend to go to bed early (mostly me) can fall sleep easily.   On Tuesday, the concrete floor affected by the renovation will be sanded, smoothed and tinted.  Things are moving right along.  Take a look:

pocket door

concrete floor treatment and color samples

fully exposed skylights let more light in now

Now and then architectural drawings of 2014 and 1950

Loki contemplating the plans before approving them.

Leave a Comment

{ 5 comments… read them below or add one }

Nikolaivishk March 4, 2014 at 3:05 am

Loki is not amused.
Can’t wait to see the finished product!

dszidon March 4, 2014 at 8:08 pm

Looking forward to having you visit!

Judy March 4, 2014 at 6:35 pm

So excited to the finished space!

dszidon March 4, 2014 at 8:07 pm

Can’t wait to chill out here with you when it’s done!

Lidia March 6, 2014 at 10:02 pm

Loki is learning!!

Previous post:

Next post: